One cold day whilst I was doing some engineering (more on that later), the sun came out from behind the clouds and shone brightly on our little cottage. Soon after, I heard a sound that now makes me cringe each time I hear it. Drip, drip, drip. The sun was strong enough to melt the snow that was on the roof and it was dripping in between the panels of OSB.
I decided it was time to cover the roof. Not exactly a job I wanted in the middle of winter. Nonetheless, it needs to be done. So I borrowed a harness from work and I bought some roof jacks (sometimes called roof brackets). This is how far we've gotten.
The shingles we have are a polymer faux slate. They require the entire roof to be covered in ice and water barrier. It's more expensive than regular roofing felt, but it's also more water proof. At first the goings were pretty slow, but I quickly learned that I needed a couple more sets of roof jacks. Once I bought more and mustered up some bravery, things started to speed up a bit. It's still a lot slower than a roof you can stand on, but we'll get it done.
The ice and water barrier needs to be tacked on with roofing nails when the temperature is below 40 degrees. Once the temperatures warm up it will adhere to the OSB.
Odds and [Beam] Ends
The engineering I was talking about had to do with attaching the beams to the concrete walls. I think it is a little overkill, but since we paid an engineer to design our roof I suppose we should probably listen to him.
The beams are clipped to the wall with 1/4" steel brackets that I had made up at the local steel fabricator. There is one on each side of the beam. They are through bolted with 5/8"x7" bolts and bolted to the wall with 5/8" wedge anchors. This "little" job was tedious and I'm glad it's done.
Also, I plumbed in a propane heater to warm our hands and feet.